Construction Trip ProjectionCEQR
491 PCE in the construction peak hour (6–7 AM), 2028 Q2

50 PCE or more: a detailed construction traffic analysis may be warranted (CEQR TM Ch.22, p.22-5). Construction trips only; for a phased project, add the operational PCEs of completed portions before applying the threshold.

Peak hours

AM peak · 6–7 AM · construction peak hour491 PCE433 in / 58 out
Transit
405 / 200
Pedestrians
441 / 200
PM peak · 3–4 PM401 PCE13 in / 388 out
Transit
405 / 200
Pedestrians
441 / 200

Transit = subway + bus + rail; pedestrians = walk + every transit rider. The 200-trip figures are reference values: CEQR TM Ch.16 Level 1 operational screening thresholds (pp.16-3 to 16-4); Ch.22 sets none for transit or pedestrians, and public FEISs commonly apply them to construction. The formal screen remains 50 PCE in the construction peak hour (p.22-5).

Hourly trips, 2028 Q2

One way, in and out of the site. Hours balanced: each column adds back to its daily total.

Vehicle trips PCE

AutoTaxiTruckTotal
HourInOutInOutInOutInOutTotal
6–7 AMAM peak375088505043358491
7–8 AM420112020632184
8–9 AM00002020202040
9–10 AM00002020202040
10–11 AM00002020202040
11 AM–12 PM00002020202040
12–1 PM00002020202040
1–2 PM00001010101020
2–3 PM00001010101020
3–4 PMPM peak0375885513388401
4–5 PM042115564854
5–6 PM000000000
Daily41741718182002006356351,270

Transit trips persons

SubwayBusRailTotal
HourInOutInOutInOutInOutTotal
6–7 AMAM peak225072010804050405
7–8 AM2508012045045
8–9 AM000000000
9–10 AM000000000
10–11 AM000000000
11 AM–12 PM000000000
12–1 PM000000000
1–2 PM000000000
2–3 PM000000000
3–4 PMPM peak022507201080405405
4–5 PM0250801204545
5–6 PM000000000
Daily2502508080120120450450900

Pedestrian trips persons, walk plus every transit rider

WalkTransit ridersTotal
HourInOutInOutInOutTotal
6–7 AMAM peak36040504410441
7–8 AM4045049049
8–9 AM0000000
9–10 AM0000000
10–11 AM0000000
11 AM–12 PM0000000
12–1 PM0000000
1–2 PM0000000
2–3 PM0000000
3–4 PMPM peak03604050441441
4–5 PM0404504949
5–6 PM0000000
Daily4040450450490490980

Daily trips, 2028 Q2

1,000 workers and 100 trucks a day · auto and taxi occupancy 1.20 · truck PCE 2.00

ModeSharePerson tripsTrips usedRule
Auto50.0%1,000834 vehiclesEVEN(ROUND(P ÷ occupancy))
Taxi1.0%2018 vehiclesEVEN(ROUND(P ÷ occupancy))
Subway25.0%500500 personsEVEN(P)
Bus8.0%160160 personsEVEN(P)
Rail12.0%240240 personsEVEN(P)
Walk4.0%8080 personsEVEN(P)
Trucks400 PCE2 × ROUND(trucks × PCE)

Quarterly increment

QuarterWA workersWA trucksWorkers countedTrucks countedWorker vehicles + truck PCE
2027 Q11506015060182.5
2027 Q23008030080285.0
2027 Q3450100450100387.5
2027 Q46009060090430.0
2028 Q1800100800100533.3
2028 Q2peak1,0001001,000100616.7
2028 Q39008090080535.0
2028 Q47006070060411.7
2029 Q14504045040267.5
2029 Q22002020020123.3

During the operational peak periods

For the overlap check in CEQR TM p.22-5. A period starting on the half hour is the mean of the two clock hours it spans.

PeriodPCE inPCE outPCE totalTransitWalkPedestrians
8:00–9:00202040000
17:00–18:00000000